






|
Coke Door Machine Project |
Technical duties for Installation & StartupA. Schultheis Automation co-coordinated the installation by our client and start-up activities so that interference with operations is kept to the absolute minimum. B. Schultheis Automation provided all personnel, instruments, equipment, programming terminals, etc., necessary for the control system start-up and testing for both the Operator Workstation & Control Logix PLC Door Machine data monitoring system. All communications; Control Logix to Intellution via wireless Ethernet, Control Logix to Temperature eyes via RS485 to RS-232 serial, Temperature eyes to laptop via RS485 to RS-232 serial, Control Logix to Panelview & Saturn Door PLC via DH+,as well as all digital and analog signals to be tested at the factory and must pass the Factory Acceptance Test prior to shipping. C. Schultheis Automation provided a trained representative for a minimum of two consecutive weeks (five days per week, eight hours per day to provide technical assistance during the course of the installation of the new system for each door machine. |
|
Project Management and scheduling was implemented for the success of the project |